Bulkhead Construction Safe Work Method Statement (SWMS)

$96.80

The Bulkhead Construction Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Bulkhead Construction Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bulkhead Construction Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bulkhead Construction Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bulkhead Construction Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bulkhead Construction Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bulkhead Construction Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips
    • falls
    • Unorganised work environment
  • 2. Material Handling
    • Heavy loads
    • Incorrect lifting techniques
  • 3. Machine Installation
    • High voltage
    • Improper handling of machinery
  • 4. Assembling Sections
    • Falling objects
    • Equipment failure
  • 5. Sealing Joints
    • Exposure to harmful chemicals
    • Fire hazards
  • 6. Cutting Bulkhead
    • Dust exposure
    • Noise pollution
  • 7. Insulation
    • Heat exposure
    • Skin irritations from materials
  • 8. Installing Fixtures
    • Electrical shock
    • Falling from height
  • 9. Painting
    • Inhalation hazards
    • Eye irritation
  • 10. Clean-up
    • Tripping over debris
    • Disposal hazard
  • 11. Inspection/QA
    • Missing safety features
    • Faulty construction
  • 12. Finalisation
    • Ignoring final check-list
    • Not adhering to WHS regulations
  • 13. Disposal of Waste
    • Unsafe disposal methods
    • cross contamination
  • 14. Report Generation
    • Missed entries
    • Falsified reports
    • not following guidelines
  • 15. Debriefing
    • Inadequate communication
    • Ignoring safety feedbacks

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bulkhead Construction Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart