Bulk Handling Of Aggregates Safe Work Method Statement (SWMS)

$96.80

The Bulk Handling Of Aggregates Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Bulk Handling Of Aggregates Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bulk Handling Of Aggregates Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bulk Handling Of Aggregates Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bulk Handling Of Aggregates Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bulk Handling Of Aggregates Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bulk Handling Of Aggregates Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposed wiring
    • Uneven surfaces
  • 2. Equipment Inspection
    • Faulty equipment
    • Lack of safety guards
  • 3. Loading Aggregates
    • Heavy lifting
    • Dust inhalation
  • 4. Transportation Of Aggregates
    • Vehicle accidents
    • Spillage
  • 5. Unloading Aggregates
    • Falling objects
    • Slips
    • trips
    • and falls
  • 6. Material Storage
    • Incorrect storage
    • Fire hazard
  • 7. Machine Operation
    • Noise pollution
    • Machinery malfunction
  • 8. Maintenance Operations
    • Unsafe handling of tools
    • Exposure to harmful substances
  • 9. Disposal of Waste Materials
    • Improper disposal methods
    • Chemical exposure
  • 10. Dealing With Spills
    • Chemical exposure
    • Slips and falls
  • 11. Site Clearing
    • Unsecured debris
    • Heavy machinery movement
  • 12. Handling Hazardous Substances
    • Chemical burns
    • Ingestion or inhalation of toxic substances
  • 13. Emergency Procedures
    • Unpreparedness for emergencies
    • Panic in emergency situations
  • 14. Demobilisation
    • Haphazard packing
    • Missed equipment check
  • 15. Post-Operation Review
    • Missing documentation
    • Failure to take lessons learned forwards
  • 16. Safety Training
    • Inadequate safety knowledge
    • Non-compliance with safety standards
  • 17. Equipment Storage
    • Inadequate storage conditions
    • Equipment corrosion
  • 18. Environmental Protection
    • Failure to manage environmental impacts
    • Pollution
  • 19. Health Monitoring
    • Insufficient health monitoring
    • Overworking
  • 20. Safety Compliance Audit
    • Incomplete audits
    • Ignoring audit results

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bulk Handling Of Aggregates Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart