Brake and Suspension Systems SWMS
This SWMS covers brake and suspension system work from bay preparation and vehicle isolation to servicing, reassembly, testing and sign-off.
Activities covered include
- Plan the work and prepare the work bay
- Machine drums and measure braking components
- Test braking systems, clean up and sign off
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers brake and suspension system work from bay preparation and vehicle isolation to servicing, reassembly, testing and sign-off. It supports planning, hazard identification and risk management for vehicle movement, lifting, stored energy, dust, fluids and component handling.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and prepare the work bay
- Position, isolate and secure the vehicle
- Lift the vehicle and remove wheels
- Control brake dust exposure
- Inspect brake, steering and suspension components
- Service hydraulic and air brake systems
- Machine drums and measure braking components
- Adjust brakes and parking brakes
- Repair suspension and steering components
- Replace springs and struts
- Reassemble hubs and wheels
- Test braking systems, clean up and sign off
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out brake and suspension system activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and prepare bay |
|
| Position and isolate vehicle |
|
| Lift vehicle and remove wheels |
|
| Control brake dust exposure |
|
| Inspect brake and steering components |
|
| Service hydraulic brake systems |
|
| Release and repair air brakes |
|
| Machine drums and measure braking |
|
| Adjust brakes and parking brake |
|
| Repair suspension and steering |
|
| Replace springs and struts |
|
| Reassemble hubs and wheels |
|
| Test braking systems |
|
| Clean up and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations: manage risks so far as reasonably practicable; provide safe plant, systems of work, information, training, instruction, supervision and consultation.
- Model Code of Practice: How to Manage Work Health and Safety Risks.
- Model Code of Practice: Managing Risks of Plant in the Workplace; apply manufacturer instructions, guarding, inspection, maintenance and energy isolation principles.
- Model Code of Practice: Hazardous Manual Tasks; redesign tasks and use mechanical aids before relying on training or PPE.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace; maintain effective controls, SDS access, labelling, ventilation and spill arrangements.
- Model Code of Practice: How to Manage and Control Asbestos in the Workplace; brake friction materials may contain asbestos and must not be cleaned with compressed air or high-pressure water.
- Guidance standards: AS/NZS 4024 series Safety of machinery; AS/NZS 1715 and AS/NZS 1716 Respiratory protective equipment; AS/NZS 1337.1 Eye and face protection; AS/NZS 1270 Hearing protectors; AS/NZS 2210.3 Safety footwear; applicable Australian Design Rules and vehicle manufacturer service specifications. Model laws and model Codes have effect only where adopted or otherwise applicable in the relevant jurisdiction.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment