Bilge And Ballast Operations Safe Work Method Statement (SWMS)

$96.80

The Bilge And Ballast Operations Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Bilge And Ballast Operations Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bilge And Ballast Operations Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bilge And Ballast Operations Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bilge And Ballast Operations Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bilge And Ballast Operations Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bilge And Ballast Operations Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slipping
    • Falling Objects
  • 2. Safety Briefing
    • Poor Communication
    • Incorrect Procedures
  • 3. Check Equipment Condition
    • Equipment Failure
    • Electric Shock
  • 4. Start Pumps and Engines
    • Noise
    • Vibration
    • Heat Emission
  • 5. Control Flow of Ballast
    • Incorrect Flow
    • Hose Leaks
  • 6. Monitor Pressure Levels
    • Pressure Buildup
    • Valve Failure
  • 7. Transfer of Ballast Water
    • Overflow
    • Contamination
  • 8. Inspect Seals and Hatches
    • Leakages
    • Faulty Lock Mechanism
  • 9. Record Operations Details
    • Data Loss
    • Miscommunication
  • 10. Emergency Drills
    • Panic
    • Improper Use Of Safety Gear
  • 11. Maintenance of Equipment
    • Faulty Equipment
    • Unexpected Shutdowns
  • 12. Handle Chemicals Safely
    • Chemical Spills
    • Fume Inhalation
  • 13. Monitor Ballast Levels
    • Overflow
    • Inadequate Ballast Level
  • 14. Secure all Hatches After Use
    • Improper Locking
    • Unauthorized Access
  • 15. Detach and Store Equipment
    • Falling Equipment
    • Trips And Falls
  • 16. Complete Paperwork
    • Misplacement
    • Unauthorised access to data
  • 17. Clean Up Operation Area
    • Chemical Spills
    • Slippery Surfaces
  • 18. Employee Debriefing
    • Miscommunication
    • Incomplete Information
  • 19. Equipment Check After Completion
    • Faulty Equipment
    • Missed Damage
  • 20. Safety Inspection for Next Operation
    • Forgotten Configurations
    • Poor Workflow

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bilge And Ballast Operations Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart