Bench Work With Hand Tools Safe Work Method Statement (SWMS)

$96.80

The Bench Work With Hand Tools Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Bench Work With Hand Tools Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Bench Work With Hand Tools Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Bench Work With Hand Tools Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Bench Work With Hand Tools Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Bench Work With Hand Tools Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Bench Work With Hand Tools Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Injury from incorrect manual handling
    • Cuts from sharp tools
  • 2. Tool Selection
    • Risk of selecting the wrong tool
    • Injury by poor tool maintenance
  • 3. Work Setup
    • Risk of poor body posture leading to musculoskeletal disorders ,Ergonomic hazards by improper workstation setup
  • 4. Hand Tool Use
    • Injury from incorrect use of hand tool
    • sound hazards from power tools
  • 5. Clearing Workspace
    • Possible slips
    • trips
    • and falls due to cluttered workspace,cuts from improperly stored tools
  • 6. Maintenance Check
    • Risk of injury or defect due to improper maintenance
  • 7. Personal Protective Equipment (PPE) Use
    • Incorrect PPE use
    • Incomplete PPE usage
  • 8. Electrical Safety
    • Possible electrocution
    • Potential for fire hazard
  • 9. Safe Handling and Disposal
    • Injury from incorrect waste disposal
    • Breathing problems due to dust
  • 10. Breakdown Procedure
    • Potential injury due to equipment failure
    • Accident caused by improper shutdown procedure
  • 11. Emergency Procedure
    • Risk of panic in crisis situations
    • Injury due to improper first aid knowledge
  • 12. Training
    • Risk of poorly trained staff leading to accidents
    • Lack of knowledge on safe procedures
  • 13. Reporting Procedures
    • Risks associated with late reporting of issues
    • Noncompliance with legal requirements
  • 14. End of Day Procedures
    • Risk of fire due to unsecured equipments
    • Risk of theft or unauthorized access to workspace
  • 15. Review and Update procedures
    • Misinterpretation of updates
    • Failure to implement necessary changes into practice

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Bench Work With Hand Tools Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart