Battery Handling And Changing Safe Work Method Statement (SWMS)

$96.80

The Battery Handling And Changing Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Battery Handling And Changing Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Battery Handling And Changing Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Battery Handling And Changing Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Battery Handling And Changing Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Battery Handling And Changing Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Battery Handling And Changing Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1.Preparation
    • Improper training
    • Unfamiliar with safety procedures
  • 2. Identifying Battery Type
    • Incorrect identification
    • Exposure to hazardous materials
  • 3. Gathering Equipment
    • Poor traffic control
    • Inadequate personal protective equipment
  • 4. Protective Clothing
    • Inappropriate clothing
    • Lack of appropriate personal protective equipment
  • 5. Removing Old Battery
    • Unsecured battery
    • Leakage of battery acid
  • 6. Cleaning Battery Compartment
    • Battery acid residue
    • Contaminated cleaning tools
  • 7. New Battery Installation
    • Improper installation
    • Battery overheating
  • 8. Checking Battery Connections
    • Faulty connections
    • Corrosion
  • 9. Battery Charging
    • Sudden explosion
    • Overcharging
  • 10. Returning Charged Battery
    • Transportation hazards
    • Incorrect battery placement
  • 11. Testing New Battery
    • System failure
    • Electrical overload
  • 12. Disposal of Old Battery
    • Improper disposal
    • Environmental pollution
  • 13. Aftercare and Maintenance
    • Delayed maintenance
    • Not following preventive measures
  • 14. Review of Safety Procedures
    • Non-compliance with safety guidelines
    • Ignoring warning signs
  • 15. Emergency Response
    • Not knowing what to do
    • Delay in response time
  • 16. Reporting and Record Keeping
    • Incorrect record keeping
    • Not reporting incidents
  • 17. Regular Check-ups
    • Delayed check-ups
    • Overlooking minor issues
  • 18. Ongoing Training
    • Irregular training
    • Not following updated safety procedures
  • 19. Audit and Inspection
    • Non-compliance with standards
    • Persistent risk factors
  • 20. Incident Management
    • Slow incident management
    • Uncontrolled hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Battery Handling And Changing Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart