Base Grading Safe Work Method Statement (SWMS)

$96.80

The Base Grading Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Base Grading Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Base Grading Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Base Grading Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Base Grading Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Base Grading Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Base Grading Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect manual handling
    • Slips
    • trips and falls
  • 2. Site Assessment
    • Falling from heights
    • Exposure to harmful substances
  • 3. Equipment Setup
    • Electrical risks
    • Crushing hazards
  • 4. Material Handling
    • Contact with moving machinery
    • Noise exposure
  • 5. Excavation Work
    • Underground services
    • Trench collapses
  • 6. Concrete Pouring
    • Exposure to cement dust
    • Working at height
  • 7. Welding Operations
    • Welding fumes
    • Fire hazards
  • 8. Power Tool Use
    • Hand-arm vibration syndrome
    • Cuts and abrasions
  • 9. Loading and Unloading
    • Crushing injuries
    • Struck by moving objects
  • 10. Installation Work
    • Electrocution
    • Falling objects
  • 11. Demolition Work
    • Asbestos exposure
    • Structural collapse
  • 12. Finishing Work
    • Dermatitis from contact with cement
    • Respiratory infections
  • 13. Cleaning Up
    • Machinery entanglement
    • Trip hazards
  • 14. Maintenance
    • Electric shocks
    • Burns and scalds
  • 15. Waste Disposal
    • Biological hazards
    • Exposures to harmful substances
  • 16. Post-Work Inspection
    • Falling objects
    • Electrical Risks
  • 17. Reporting Process
    • Stress from work
    • Violence from third party
  • 18. Decommission Processes
    • Exposure to harmful gases
    • Physical hazards
  • 19. Site Restoration
    • Uncontrolled release of a substance
    • Trip hazards
  • 20. Feedback & Review
    • Fatigue
    • Repetitive strain injuries

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Base Grading Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart