Attachment Of Drywall Track System Safe Work Method Statement (SWMS)

$96.80

The Attachment Of Drywall Track System Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Attachment Of Drywall Track System Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Attachment Of Drywall Track System Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Attachment Of Drywall Track System Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Attachment Of Drywall Track System Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Attachment Of Drywall Track System Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Attachment Of Drywall Track System Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect manual handling
    • Working at height risk
  • 2. Loading Tools & Equipment
    • Weight lifting injuries
    • Accidental falls from loading truck
  • 3. Measuring and Marking
    • Eye injury from dust
    • Slip
    • trip and falls
  • 4. Track Cutting
    • Machinery operation risks
    • Noise hazards
    • Hand and finger injuries
  • 5. Positioning Tracks
    • Falling objects hazard
    • Incorrect manual handling risk
  • 6. Drilling into Floor and Ceiling
    • Noise and vibration
    • Dust inhalation risk
    • Electrical shock
  • 7. Fastening Tracks
    • Machinery operations risks
    • Hand and finger injuries
  • 8. Inspection of Installed Tracks
    • Slip
    • trip and fall hazards
    • Working at height risk
  • 9. Corrective Actions (if required)
    • Exposure to electricity
    • Falling from height risk
  • 10. Cleaning Up
    • Incorrect manual handling
    • Slip
    • trip and fall risks
    • Disposal of waste materials
  • 11. De-loading Tools & Equipment
    • Weight lifting injuries
    • Accidental falls during unloading
  • 12. Equipment Maintenance
    • Risk of electric shock
    • Chemical exposure while cleaning
  • 13. Documentation & Reporting
    • Mental stress due to workload
    • Eye strain due to computer use
  • 14. End of Day Procedures
    • Fatigue-related incidents
    • Security risks after working hours
  • 15. Emergency Procedures
    • Incorrect usage of fire extinguishers
    • Panic during an evacuation process
  • 16. Training & Competency Review
    • Mental stress from pressure to perform
    • Injury due to improper training
  • 17. Workplace Inspection
    • Slip
    • trip and fall risks
    • Exposure to unhygienic surfaces
  • 18. Performance Evaluation
    • Mental stress due to workload
    • Inadequate break times leading to fatigue
  • 19. Incident Reporting
    • Risks associated with non-compliance
    • Miscommunication leading to errors
  • 20. Equipment Audit
    • Incorrect tagging of faulty equipment
    • Risks due to usage of un-serviced equipment

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Attachment Of Drywall Track System Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart