Attaching Tow Hooks Securely Safe Work Method Statement (SWMS)

$96.80

The Attaching Tow Hooks Securely Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Attaching Tow Hooks Securely Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Attaching Tow Hooks Securely Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Attaching Tow Hooks Securely Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Attaching Tow Hooks Securely Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Attaching Tow Hooks Securely Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Attaching Tow Hooks Securely Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Incorrect handling of tow hooks
  • 2. Assessing the vehicle
    • Falling objects
    • Vehicle movement
  • 3. Lock Out Tag Out (LOTO)
    • Electric shock
    • Unexpected re-energising
  • 4. Selecting Tow Hooks
    • Mismatched equipment
    • Equipment failure
  • 5. Testing Tow Hooks
    • Mishandling
    • Equipment failure
  • 6. Positioning for Attachment
    • Awkward postures
    • Struck by vehicle
  • 7. Attaching Tow Hooks
    • Missteps
    • Equipment failure
  • 8. Checking Attachment
    • Incorrect attachment
    • Falls from height
  • 9. Securing Tow Hooks
    • Struck by equipment
    • Equipment failure
  • 10. Final Inspection
    • Overlooking hazards
    • Falls from height
  • 11. Test Pull
    • Over-pulling
    • Vehicle movement
  • 12. Disconnecting Tow Hooks
    • Missteps
    • Falling objects
  • 13. Cleaning Up
    • Manual handling injuries
    • Exposed to harmful substances
  • 14. Post-Operation Review
    • Inadequate feedback
    • Missed hazards
  • 15. Maintenance and Storage
    • Inadequate maintenance
    • Poor storage practices
  • 16. Incident Reporting
    • Under-reporting
    • Delay in communication
  • 17. Periodic Safety Audits
    • Missed audit schedules
    • Incomplete hazard assessment
  • 18. Emergency Response Training
    • Missteps during emergency
    • Improper use of safety equipment
  • 19. Regular Training and Refresher Courses
    • Inadequate training
    • Non-compliance with procedures
  • 20. Health Monitoring
    • Poor health condition
    • Lack of regular check-ups

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Attaching Tow Hooks Securely Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart