Attach Mudguards Safe Work Method Statement (SWMS)

$96.80

The Attach Mudguards Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Attach Mudguards Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Attach Mudguards Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Attach Mudguards Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Attach Mudguards Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Attach Mudguards Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Attach Mudguards Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Manual handling
    • exposure to chemicals
  • 2. Work Area Setup
    • Slips
    • trips and falls
    • working in traffic
  • 3. Identify Materials & Tools
    • Incorrect tool use
    • eye injuries from debris
  • 4. Attach Mudguards
    • Cutting or piercing injuries
    • muscle strain
  • 5. Testing
    • Equipment malfunction
    • incorrect operation of mudguards
  • 6. Cleaning Up
    • Exposure to harmful dust or chemicals
    • manual handling injuries
  • 7. Equipment Inspection
    • Electric shock from malfunctions
    • hand injuries
  • 8. Use of Hand Tools
    • Incorrect tool use
    • eye injuries from flying debris
  • 9. Secure the Mudguard
    • Incorrect fastening
    • hand injuries
  • 10. Post Operation Checks
    • Mudguard failure
    • manual handling injuries
  • 11. Equipment Storage
    • Tripping on poorly stored equipment
    • injuries from falling objects
  • 12. Document Completion
    • Eye strain from computer screen
    • repetitive strain injury from typing
  • 13. Reporting Incidents
    • Emotional stress
    • verbal abuse
  • 14. Review Safe Work Method Statement (SWMS)
    • Misinterpretation of SWMS
    • lack of understanding SWMS
  • 15. Close Out Project
    • Mental fatigue from long work hours
    • paper cuts from handling documents
  • 16. Waste Disposal
    • Injury from sharp objects
    • exposure to hazardous materials
  • 17. Emergency Procedures
    • Panic in emergency situations
    • injuries during evacuation
  • 18. Training New Staff
    • Inadequate training leading to accidents
    • anxiety from new tasks
  • 19. General Inspection
    • Misidentification of hazards
    • overlooked safety protocols
  • 20. Equipment Maintenance
    • Equipment malfunctioning
    • electric shock from faulty equipment

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Attach Mudguards Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart