Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS)

$96.80

The Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Asbestos Removal From Old Tile Adhesive Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Asbestos Removal From Old Tile Adhesive Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Asbestos Removal From Old Tile Adhesive Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inhalation of asbestos fibres
    • Contact with damaged materials
  • 2. Site Assessment
    • Accidental contact with asbestos
    • Inappropriate disposal methods
  • 3. Equipment Gathering
    • Asbestos contamination on equipment
    • Incorrect tool usage resulting in fibre release
  • 4. Safety Measures Setup
    • Insufficient PPE use
    • Uncontrolled dust creation
  • 5. Area Isolation
    • Inadequate barrier setup
    • Public access during removal
  • 6. Wetting Asbestos Material
    • Inhaling airborne fibres
    • Slipping on wet surfaces
  • 7. Removing Old Tiles
    • Exposure to airborne asbestos
    • Sharp tool injuries
  • 8. Securely Bagging Materials
    • Improper sealing
    • Spillages from bags breaking
  • 9. Cleaning Work Area
    • Dust and fibre residual
  • 10. Decontamination of Workers' Equipment
    • Incomplete decontamination processes
    • Cross-contamination
  • 11. Transporting Asbestos Waste
    • Unapproved waste transport
    • Leakage during transit
  • 12. Disposing Asbestos Waste
    • Illegal dumping
    • Incomplete waste disposal records
  • 13. Air Monitoring
    • Continuous exposure to asbestos
    • Improper use of air sampling equipment
  • 14. Documentation and Review
    • Incomplete or inaccurate documentation
    • Non-conformity with safety regulations
  • 15. Final Inspection
    • Missed spots of contamination
    • inadequate clean up
  • 16. Emergency Preparedness
    • Inadequate response to asbestos exposure incidents
    • Lack of first aid facilities
  • 17. Training and Supervision
    • Untrained workers
    • Inadequate or incorrect safety instruction
  • 18. Equipment Maintenance
    • Sub-standard equipment
    • Lack of regular inspections
  • 19. Communication with Stakeholders
    • Inconsistent communication
    • Misinformation resulting in potential risks
  • 20. Review and Improvement
    • Lack of ongoing improvement processes
    • Failure to identify and correct hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Asbestos Removal From Old Tile Adhesive Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart