Asbestos Containing Materials Removal SWMS

This SWMS covers identifying, removing, containing and disposing of asbestos-containing materials.
Activities covered include
- Survey and identify asbestos-containing materials
- Remove non-friable and friable asbestos-containing materials
- Clear the area, dismantle controls and complete sign-off
- Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
Free company branding
Your logo, ABN and business details added at no extra cost.
2 years of free updates
Compliance updates included for two years, with updated documents available in your portal.
Acceptance guaranteed
Free revisions to meet your client or principal's review requirements, with resubmission support until accepted.
Product Overview
This SWMS covers identifying, removing, containing and disposing of asbestos-containing materials. It supports risk management for fibre release, work-area isolation, decontamination, waste handling and final clearance activities.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Survey and identify asbestos-containing materials
- Plan the removal work and coordinate site activities
- Isolate the work area and control entry
- Install the enclosure and decontamination arrangements
- Inspect equipment and personal protective equipment
- Remove non-friable and friable asbestos-containing materials
- Remove tiles, coatings, contaminated soil and debris
- Conduct air monitoring and manage fibre-release concerns
- Decontaminate workers and equipment
- Package, transport and dispose of waste
- Clear the area, dismantle controls and complete sign-off
Who is this for?
Suitable for contractors, workers, supervisors and businesses carrying out asbestos-containing materials removal activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Survey and identify materials |
|
| Plan licensed removal work |
|
| Isolate work area |
|
| Install enclosure and decontamination |
|
| Inspect equipment and PPE |
|
| Remove non-friable ACM |
|
| Remove friable asbestos |
|
| Remove tiles and coatings |
|
| Manage contaminated soil and debris |
|
| Conduct air monitoring |
|
| Decontaminate workers and equipment |
|
| Package and transport waste |
|
| Clear, dismantle and sign off |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations, including duties to identify asbestos, control exposure, manage licensed asbestos removal, provide information/training, conduct health monitoring where required, and manage asbestos waste.
- Model Code of Practice: How to Safely Remove Asbestos (guidance only; confirm adoption and status in the relevant jurisdiction).
- Model Code of Practice: How to Manage and Control Asbestos in the Workplace (guidance only; confirm adoption and status in the relevant jurisdiction).
- Model Code of Practice: Construction Work; Managing the Work Environment and Facilities; Managing Risks of Falls at Workplaces; Confined Spaces; and Managing Electrical Risks in the Workplace, where relevant.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment.
- AS/NZS 1716 Respiratory protective devices.
- AS/NZS 1801 Occupational protective helmets.
- AS/NZS 2210.3 Personal protective equipment—Safety footwear.
- AS/NZS 3012 Electrical installations—Construction and demolition sites.
- National Environment Protection (Assessment of Site Contamination) Measure 1999, as guidance for asbestos-contaminated soil assessment and remediation.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes free branding + 2 years of free updates
$79.50
$96.80
Free branding + 2 years of updates