Apply Roll Roofing Safe Work Method Statement (SWMS)

$96.80

The Apply Roll Roofing Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Apply Roll Roofing Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Apply Roll Roofing Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Apply Roll Roofing Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Apply Roll Roofing Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Apply Roll Roofing Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Apply Roll Roofing Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Potential exposure to sun
    • Inadequate manual handling training
  • 2. Roll Roofing Loading
    • Mishandling of equipment
    • Slips
    • trips and falls
  • 3. Protective Measures Set-Up
    • Ineffective safety measures
    • Working at heights risks
  • 4. Roll Roofing Unloading
    • Clinching injuries
    • Hazardous substances exposure
  • 5. Material Positioning
    • Manual handling injuries
    • Power tool mishaps
  • 6. Cutting the Roll Roofing
    • Deep cuts
    • Eye injuries from flying particles
  • 7. Fixing the Roofing
    • Working at heights
    • Inadequate tools or machinery
  • 8. Check Fixing
    • Structural instability
    • Falls from height
  • 9. Tidying the Site
    • Trips over materials
    • Improper disposal of waste
  • 10. Afterwork Checks
    • Missed hazards
    • Unresolved issues
  • 11. Emergency Procedures
    • Fire/explosion
    • Chemical spillage
  • 12. Review of Work Process
    • Missed hazards
    • Miscommunication among team
  • 13. Equipment Maintenance
    • Machinery malfunction
    • Electrical hazards
  • 14. Training and Briefings
    • Misinformation about job roles
    • Lack of training
  • 15. Regular Safety Audits
    • Missed regular audits
    • Non-compliance with safety standards
  • 16. Material Disposal Procedure
    • Noncompliant waste disposal
    • Risk of infection from hazardous waste
  • 17. Carrying Out Inspections
    • Not identifying all hazards
    • Ignoring minor faults
  • 18. Final Checking Procedures
    • Unresolved issues
    • Not following the checklist
  • 19. Handling Feedbacks
    • Miscommunication among team
    • Not implementing feedbacks timely
  • 20. Updating Policies and Procedures
    • Old procedures not revised
    • New policies not implemented timely

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Apply Roll Roofing Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart