Apply Artificial Turf Safe Work Method Statement (SWMS)

$96.80

The Apply Artificial Turf Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Apply Artificial Turf Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Apply Artificial Turf Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Apply Artificial Turf Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Apply Artificial Turf Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Apply Artificial Turf Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Apply Artificial Turf Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards
    • Improper use of tools
    • Unsecure work area
  • 2. Area Marking
    • Inaccurate measurement
    • Chemical contact from marking spray
  • 3. Clearing Site
    • Struck by moving vehicle
    • Dust inhalation
    • Overexertion
  • 4. Soil Compaction
    • Noise exposure
    • Vibration exposure
    • Dehydration
  • 5. Base Material Laying
    • Misuse of aggregate materials
    • Physical strain
  • 6. Turf Cutting
    • Manual handling injuries
    • Equipment malfunction
  • 7. Turf Positioning
    • Poor posture
    • Trip hazards
    • Cuts from turf edges
  • 8. Glue Application
    • Chemical exposure
    • Skin irritation
    • Fume inhalation
    • Fire hazard
  • 9. Seaming Tape Placement
    • Eye strain
    • Inadequate ventilation
  • 10. Turf Trimming
    • Cuts and lacerations
    • Poorly maintained equipment
  • 11. Infill Spreading
    • Dust inhalation
    • Repeated motion strain - MSD
  • 12. Surface Brushing
    • Machinery entanglement
    • Noise exposure
    • Repeated motion strain - MSD
  • 13. Cleanup Process
    • Sharps
    • Tripping
    • Falling objects
    • Mistakes in waste segregation
  • 14. Final Inspection
    • Overlooking small details
    • rushing through inspection
    • complacency
  • 15. Customer Approval
    • Miscommunication
    • Customer dissatisfaction
  • 16. Equipment Storage
    • Improper storage
    • Trip hazards
    • Inadequate security

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Apply Artificial Turf Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart