Animal Habitat Identification Safe Work Method Statement (SWMS)

$96.80

The Animal Habitat Identification Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Animal Habitat Identification Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Animal Habitat Identification Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Animal Habitat Identification Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Animal Habitat Identification Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Animal Habitat Identification Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Animal Habitat Identification Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Unfamiliarity with species
    • Incorrect use of tools
  • 2. Terrain Assessment
    • Tripping
    • Falls from heights
  • 3. Gear Collection
    • Heavy lifting
    • Improper storage
  • 4. Habitat Identification
    • Incorrect identification
    • Inadequate training
  • 5. Data Collection
    • Loss of data
    • Incorrect recording
  • 6. Hazardous Animal Encounter
    • Bites
    • Stings
  • 7. Weather Conditions
    • Heatstroke
    • Hypothermia
  • 8. Tool Usage
    • Inappropriate usage
    • Equipment failure
  • 9. Navigation
    • Getting lost
    • Difficult terrain
  • 10. Communication
    • Lack of signal
    • Equipment malfunction
  • 11. Food and Water Supply
    • Insufficient supplies
    • Contamination
  • 12. Health and Hygiene
    • Mild Illness
    • Serious Injury
  • 13. Emergency Response
    • Slow response times
    • Insufficient training
  • 14. Pack Up and Return
    • Driving fatigue
    • Lost equipment
  • 15. Data Analysis
    • Misinterpretation
    • Loss of data
  • 16. Report Writing
    • Missed details
    • Spelling errors
  • 17. Presentation of Findings
    • Miscommunication
    • Technology malfunctions
  • 18. Follow Up Actions
    • Delayed actions
    • Incorrect measures
  • 19. Continuous Improvement
    • Lack of feedback
    • Resistance to change
  • 20. Debriefing
    • Miscommunication
    • Inadequate reflection

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Animal Habitat Identification Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart