All-Terrain Vehicle Operation Safe Work Method Statement (SWMS)

$96.80

The All-Terrain Vehicle Operation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the All-Terrain Vehicle Operation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The All-Terrain Vehicle Operation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The All-Terrain Vehicle Operation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. All-Terrain Vehicle Operation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe All-Terrain Vehicle Operation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The All-Terrain Vehicle Operation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect use of personal protective equipment
    • Unavailability of first-aid kit
  • 2. Check Vehicle Condition
    • Vehicle malfunctioning
    • Inadequate checking
  • 3. Load Equipment on ATV
    • Manual handling issues
    • Inadequately secure load
  • 4. Travelling to Site
    • Collision with pedestrian or another vehicle
    • Navigational error
  • 5. Unloading Equipment
    • Manual handling issues
    • Dropping heavy item
  • 6. Operation Start-Up
    • Mechanical failure
    • Improper operation procedures
  • 7. Operate All-Terrain Vehicle
    • Unsafe driving
    • Not using seat belts
  • 8. Parking and Turning Off the Vehicle
    • Inaccurate parking
    • Ignoring shutdown procedure
  • 9. Maintenance Activity
    • Rushing maintenance activity
    • Contact with hazardous chemicals
  • 10. Refuelling
    • Accidental spill
    • Contact with hazardous substances
  • 11. Emergency Procedures
    • Lack of training
    • Panic during emergency
  • 12. Night Operations
    • Reduced visibility
    • Fatigue or drowsiness
  • 13. Working in Severe Weather
    • Extreme temperatures
    • Slippery surface
  • 14. Termination
    • Improper shut down
    • Lacking post-operation check
  • 15. Post Work Clean Up
    • Exposure to cleaning chemicals
    • Cutting self with sharp objects
  • 16. Report Writing
    • Data privacy breaches
    • Incorrect information
  • 17. Debriefing
    • Unresolved issues
    • Poor communication
  • 18. Review of Operations
    • Inadequate feedback
    • Ignoring process improvement
  • 19. Storage and Security
    • Illegal access to ATV
    • Damaging storage area
  • 20. Next Day Preparation
    • Poor handover
    • Not reviewing daily plan

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The All-Terrain Vehicle Operation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart