Administer Production Flowback Safe Work Method Statement (SWMS)

$96.80

The Administer Production Flowback Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Administer Production Flowback Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Administer Production Flowback Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Administer Production Flowback Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Administer Production Flowback Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Administer Production Flowback Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Administer Production Flowback Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Trip hazards from unorganised work area
    • Musculoskeletal injury from heavy lifting
  • 2. Equip Installation
    • Electrocution from improper handling of equipment
    • Injury from machinery malfunction
  • 3. Training in Operation Procedures
    • Miscommunication leading to improper operation
    • Inadequate understanding of safety protocols
  • 4. Production Flowback Monitoring
    • Exposure to high pressure systems
    • Loosing control over the process due to system failure
  • 5. Collection and Analysis
    • Mistakes in data interpretation
    • Unsafe handling of collected samples
  • 6. Routine Maintenance
    • Injury from incorrect maintenance procedure
    • Exposure to harmful substances
  • 7. Troubleshooting
    • Accidents due to lack of problem knowledge
    • Panic leading to more mistakes
  • 8. Additional Adjustment Implementation
    • The adjustment could lead to unanticipated complications
    • operators may not know all the underlying workings of the new changes
  • 9. Report Generation
    • Inaccurate reporting
    • Miscommunication of vital information
  • 10. Waste Disposal
    • Chemical burns
    • Environmental pollution
  • 11. De-Equip
    • Exposure to trapped pressure
    • Mistakes in valve closure operations
  • 12. Evaluation & Review
    • Missed evaluation points leading to unnoticed issues
    • Unresolved complaints and reviews
  • 13. Training in Routine Works
    • Inadequate understanding of the importance of routine works
    • Miscommunication in the explanation for the standard operating procedures
  • 14. Rotation System Planning
    • Inadequate foresight in regards to operator fatigue
    • Improper planning leading to manpower shortage at critical times
  • 15. Emergency Response Training
    • Panic during emergency situations
    • Incorrect execution of safety measures during emergencies
  • 16. Health-Checks and Mental Wellness Sessions
    • Misidentification of physical or mental health issues
    • Ignorance towards regular check-ups and wellness sessions
  • 17. Post-Operations Infrastructure Checks
    • Missed damaged parts
    • Lack of complete infrastructure understanding leading to oversight of key factors
  • 18. Disciplinary Actions
    • Mistreatment of operators
    • Missed protocol violation actions
  • 19. Resource Inventory Management
    • Loss or mismanagement of resources
    • Miscalculations in resource inventory and tracking
  • 20. Revisiting Standard Operating Procedures
    • Misinterpreted operating procedures
    • Complacency leading to overlooking crucial details

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Administer Production Flowback Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart