Adjusting Commercial Levers Safe Work Method Statement (SWMS)

$96.80

The Adjusting Commercial Levers Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Adjusting Commercial Levers Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Adjusting Commercial Levers Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Adjusting Commercial Levers Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Adjusting Commercial Levers Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Adjusting Commercial Levers Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Adjusting Commercial Levers Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Unfit equipment
    • Inadequate training
  • 2. Inspecting Levers
    • Physical strain
    • Sharp edges
  • 3. Setting Up
    • Lifting injuries
    • Incorrect setup
  • 4. Adjusting Levers
    • Incorrect handling
    • Repetitive strain injury
  • 5. Testing Adjustment
    • Electric shock
    • Mechanical failure
  • 6. Finishing Up
    • Careless clean up
    • Discarded materials
  • 7. Reporting
    • Miscommunication
    • Lost information
  • 8. Maintenance Check
    • Faulty levers
    • Neglected maintenance
  • 9. Handling Feedback
    • Negative feedback
    • Missed adjustments
  • 10. Iterative Adjustment
    • Overuse of machine
    • Human error
  • 11. Breakdown Procedures
    • Lack of understanding
    • Delay in execution
  • 12. Emergency Preparedness
    • Lack of resources
    • Panic
  • 13. Transport of Levers
    • Inappropriate packaging
    • Mishandling
  • 14. Storage Procedure
    • Misplacement
    • Improper storage
  • 15. Final Inspection
    • Overlooked flaws
    • Hasty review
  • 16. Documentation
    • Loss of records
    • Misinterpretation
  • 17. Crew Coordination
    • Miscommunication
    • Lack of teamwork
  • 18. Tool Handling
    • Inaccurate handling
    • Unsafe practices
  • 19. Equipment Sterilisation
    • Contamination
    • Incorrect method
  • 20. Quality Control
    • Compromise on quality
    • Hasty checkups

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Adjusting Commercial Levers Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart