Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Adhering Tiles To Wall Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Trips/Slips on loose materials
- Inhaling of harmful dust
- 2. Checking Wall Stability
- Falling Objects
- Cuts from sharp objects
- 3. Planning Tile Layout
- Strain from incorrect lifting techniques
- Cuts from tile edges
- 4. Mixing Adhesive
- Skin Irritation from adhesive
- Slips on spilled adhesive
- 5. Applying Adhesive to Tiles
- Excessive exposure to chemical substances
- Eye injury from flying particles
- 6. Placing Tiles On Wall
- Falling from height
- Strain from overexertion
- 7. Checking Tile Placement
- Trips/Slips due to clutter
- Minor cuts or abrasions
- 8. Spacers and Alignment Checks
- Eye strain
- Repetitive strain injuries
- 9. Grout Application
- Chemical burns from grout materials
- Inhalation hazards
- 10. Cleaning Up Post Grouting
- Slips from wet surfaces
- Chemical residue hazards
- 11. Final Sealing Process
- Respiratory issues due to chemicals
- Eye irritations from sealants
- 12. Clean-up and Waste Disposal
- Slips/Trips over debris
- Hazardous material handling
- 13. Periodic Inspections
- Fall hazards from elevation
- Physical strain
- 14. Maintenance Procedure
- Electrical hazards
- Falls from unsecured ladder
- 15. Reporting Process
- Paper cuts
- Eye strain from long-term screen exposure