Adherence To Diving Signals Safe Work Method Statement (SWMS)

$96.80

The Adherence To Diving Signals Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Adherence To Diving Signals Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Adherence To Diving Signals Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Adherence To Diving Signals Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Adherence To Diving Signals Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Adherence To Diving Signals Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Adherence To Diving Signals Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to harmful substances
    • Equipment malfunction
  • 2. Assess Weather Conditions
    • Adverse weather conditions
    • Marine life hazards
  • 3. Dive Planning
    • Insufficient planning
    • Inaccurate information
  • 4. Check Equipment
    • Equipment malfunction
    • Incorrect assembly
  • 5. Pre-Dive Briefing
    • Miscommunication
    • Lack of understanding
  • 6. Enter Water
    • Slips and falls
    • Cold shock
  • 7. Underwater Tasks
    • Drowning
    • Decompression sickness
  • 8. Ascend
    • Rapid ascent
    • Oxygen toxicity
  • 9. Post-Dive Checks
    • Hyperbaric injuries
    • Prolonged exposure to cold
  • 10. Equipment Maintenance
    • Improper storage
    • Untreated damages
  • 11. Documentation
    • Incorrect record disclosure
    • Non-adherence to regulations
  • 12. Emergency Procedures
    • Miscommunication
    • Panic
  • 13. Medical Fitness
    • Long-term health issues
    • Physical exhaustion
  • 14. Personal Hygiene
    • Infections
    • Allergies
  • 15. Debrief
    • Oversight of incidents or changes
    • Miscommunication
  • 16. Disposal
    • Defective equipment
    • Environmental hazard
  • 17. Decontamination Procedures
    • Exposure to harmful substances
    • Insufficient decontamination
  • 18. Surveillance
    • Non-detection of diver
    • Malfunctioning equipment
  • 19. Re-entry Procedures
    • Improper execution
    • Physical exhaustion
  • 20. Demob
    • Miscommunication
    • Damage to equipment

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Adherence To Diving Signals Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart