Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS)

$96.80

The Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Acrylic Solid Surface Fabrication Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Acrylic Solid Surface Fabrication Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Acrylic Solid Surface Fabrication Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect lifting techniques
    • Faulty machinery
  • 2. Layout Cutting
    • Hand injury
    • Eye injury from flying particles
    • Noise pollution
  • 3. Joining/Seaming
    • Chemical exposure
    • Poor ventilation
    • Fire hazards
  • 4. Sanding
    • Dust Inhalation
    • Noise pollution
    • Hand-arm vibration syndrome
  • 5. Finishing
    • Chemical exposure
    • Lack of proper PPE
    • Slippery surfaces
  • 6. Cleaning
    • Chemical exposure
    • Wet surfaces
    • Electrical hazards
  • 7. De-Burring
    • Cuts and abrasions
    • High noise levels
    • Vibration related injuries
  • 8. Drilling
    • Eye injury
    • Noise Pollution
    • Workpiece ejection
  • 9. Edging
    • Hand injury
    • Hearing damage
    • Incorrect tool use
  • 10. Waste disposal
    • trips and falls
    • Hazardous waste
    • Manual handling injuries
  • 11. Inspection
    • Incorrect lifting techniques
    • Faulty machinery
    • Chemical exposure
  • 12. Transportation
    • Manual handling injuries
    • Slip or trip risks
    • Falling loads
  • 13. Installation
    • Physical strain
    • Incorrect use of tools
    • Falls from heights
  • 14. Handover to Customer
    • Missing information
    • Incorrect installation
    • Customer dissatisfaction
  • 15. Post-Project Review
    • Lack of feedback
    • Overlooking risks
    • Ignoring learnings
  • 16. Maintenance
    • Electrical hazards
    • Unexpected energy release
    • Chemical exposure
  • 17. Disposal
    • Environmental pollution
    • Inadequate waste separation
    • Must comply with regulations
  • 18. Emergency preparedness
    • Lack of emergency procedures
    • Insufficient first aid measures
  • 19. Supply Chain Management
    • Supplier related risk
    • Non compliance with contract conditions
    • Late deliveries
  • 20. Training and Certification
    • Untrained personnel
    • Incorrect use of tools
    • Lack of certificates

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Acrylic Solid Surface Fabrication Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart