Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS)

$96.80

The Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Accidental Damage To Surroundings During Installation Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Accidental Damage To Surroundings During Installation Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Accidental Damage To Surroundings During Installation Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping hazards
    • exposure to harmful materials
  • 2. Delivery of Materials
    • Falling objects
    • risk of collision with moving vehicles
  • 3. Manual Handling
    • Strains and sprains
    • back injuries
  • 4. Utilising Power Tools
    • Electrocution
    • cuts or lacerations
  • 5. Installation Works
    • Falls from heights
    • dropped tools or equipment
  • 6. Lifting Using Machines
    • Machine malfunctions
    • loads not secured properly
  • 7. Wiring and Cabling
    • Electric shocks
    • fire hazard
  • 8. Plastering and Painting
    • Chemical exposure
    • slip and trip hazards
  • 9. Insulation
    • Inhalation of fibres
    • skin irritation
  • 10. Clean up and Disposal
    • Improper waste disposal
    • sharp object hazards
  • 11. Quality Control Check
    • Overexertion
    • ergonomic hazards
  • 12. Handover and Completion
    • Slip and fall hazards
    • improper documentation
  • 13. Maintenance Works
    • Working at heights
    • electrical dangers
  • 14. Emergency Procedures
    • Fire hazards
    • medical emergencies
  • 15. Training and Induction
    • Risks associated with untrained workers
    • inadequate supervision
  • 16. Document Review and Auditing
    • Incorrect documentation
    • overlooking hazards
  • 17. Continuous Monitoring
    • Complacency
    • lack of hazard recognition
  • 18. Reaction to Changes in Process
    • Hasty changes
    • poor communication leading to hazards
  • 19. Incident Reporting and Investigation
    • Incomplete reporting
    • bias in investigation
  • 20. Review of Safety Procedures
    • Obsolescent protocols
    • overlooking new hazards

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Accidental Damage To Surroundings During Installation Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart