Accessing High Stock Areas Safe Work Method Statement (SWMS)

$96.80

The Accessing High Stock Areas Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Accessing High Stock Areas Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Accessing High Stock Areas Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Accessing High Stock Areas Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Accessing High Stock Areas Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Accessing High Stock Areas Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Accessing High Stock Areas Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over object
    • Electrical shock from power cords
  • 2. Site assessment
    • Inadequate lighting
    • Unstable stock placement
  • 3. Equipment check
    • Falls due to faulty ladders
    • Inadequate personal protective equipment
  • 4. Positioning ladder
    • Fall from height
    • Struck by moving vehicle
  • 5. Deposing old stock
    • Exposure to dust and allergens
    • Manual handling injury
  • 6. Climbing up ladder
    • Falling from height
    • Slipping on ladder rung
  • 7. Accessing high stock
    • Falling objects
    • awkward postures while reaching for stock
  • 8. Handling high stock
    • Manual handling injury
    • falling objects
  • 9. Moving stock down
    • Falling objects
    • manual handling injuries
  • 10. Stock placement
    • Incorrect stacking
    • unstable stacks
  • 11. Descending ladder
    • Fall from height
    • Slip or trip from ladder
  • 12. Stock take
    • Incorrect count causing overload
    • manual handling injuries
  • 13. Removal of waste/old stock
    • Trip hazard from accumulated waste
    • manual handling injury from lifting heavy waste
  • 14. Site cleanup
    • Dehydration if not regularly drinking water
    • Trip hazards from untidy area
  • 15. Reporting and reviewing
    • Miscommunication leads to unsafe practices
    • Incomplete information causing future problems

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Accessing High Stock Areas Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart