Access Raised Platforms Safe Work Method Statement (SWMS)

$96.80

The Access Raised Platforms Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Access Raised Platforms Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Access Raised Platforms Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Access Raised Platforms Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Access Raised Platforms Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Access Raised Platforms Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Access Raised Platforms Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Injury due to handling tools
    • Tripping hazards
  • 2. Site Inspection
    • Struck by moving objects
    • Electrical hazards
  • 3. Setting Up
    • Falls from height
    • Hand injuries
  • 4. Accessing Platform
    • Fall from height
    • Slips and trips
  • 5. Working at Height
    • Falls from height
    • Overexertion
  • 6. Use of Tools
    • Injuries *from* powered hand tools
    • Eye injury from flying debris
  • 7. Movement on Platform
    • Slip
    • trip and fall hazards
    • Encounter with moving machinery
  • 8. Positioning Materials
    • Manual handling injuries
    • Struck by falling objects
  • 9. Regular Breaks (Rest)
    • Fatigue
    • Over-exertion
  • 10. Clean Up
    • Mishandling tools/materials
    • Trip hazards from debris
  • 11. Disassembling
    • Mishandling materials/tools
    • Falls from height
  • 12. Leaving Worksite
    • Struck by moving vehicles
    • Trips on uneven surface
  • 13. Documentation Update
    • Eyestrain
    • Musculoskeletal discomfort (ergonomic)
  • 14. Equipment Check
    • Maintaining equipment
    • Exposure to harmful substances
  • 15. Reporting Incidents
    • Psychological stress
    • Poor communication
  • 16. Safety Training
    • Knowledge gap
    • Miscommunication
  • 17. Hazard Reporting
    • Unreported hazards
    • Inefficient communication
  • 18. Conditioning and Rest
    • Mental fatigue
    • Physical exertion
  • 19. Washing and Sanitizing
    • Exposure to harmful chemicals
    • Skin irritations
  • 20. Off-hours Response
    • Fatigue
    • Stress from improper work-life balance

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Access Raised Platforms Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart