Abrasive Blasting SWMS
This SWMS covers planning, preparing, carrying out and closing out abrasive-blasting work.
Activities covered include
- Plan the work and assess surfaces and coatings
- Load abrasive media
- Clean equipment, demobilise and complete handover records
Download immediately
Your editable Word and PDF files are ready to download after purchase.
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.

- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content - Ready to Deploy Immediately
- Customisable - Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Product Overview
This SWMS covers planning, preparing, carrying out and closing out abrasive-blasting work. It supports work planning and risk management for dust, coatings, abrasive discharge, compressed air, work zones, waste and residual contamination.
Activities & Specific Tasks Covered
This document includes task-specific risk controls for:
- Plan the work and assess surfaces and coatings
- Establish the work area and exclusion zone
- Set up a blasting cabinet or enclosure
- Inspect blasting plant and compressed-air equipment
- Prepare breathing air and protective equipment
- Load abrasive media
- Carry out abrasive blasting
- Blast windows, doors, finishes, vehicles, boats or machinery as required
- Perform pipeline or shot-peening work where required
- Recover spent abrasive and dust
- Clean equipment, demobilise and complete handover records
Who is this for?
For contractors, workers, supervisors and businesses carrying out abrasive-blasting activities.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| Plan work and assess surfaces |
|
| Establish work area and exclusion zone |
|
| Set up cabinet or enclosure |
|
| Inspect plant and compressed air |
|
| Prepare breathing air and PPE |
|
| Load abrasive media |
|
| Undertake abrasive blasting |
|
| Blast windows doors and finishes |
|
| Blast vehicles boats and machinery |
|
| Perform pipeline and shot peening |
|
| Recover spent abrasive and dust |
|
| Clean equipment and demobilise |
|
| Complete records and handover |
|
Need to add specific site requirements?
Use the BlueSafe Portal to tailor this SWMS with site-specific details, job steps, hazards, controls and responsibilities before work starts.
Acceptance Guaranteed: If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
Legislation & References
The template includes references relevant to the documented work, including:
- Applicable Commonwealth, state or territory WHS/OHS legislation and regulations.
- Model Code of Practice: Abrasive Blasting — practical guidance for managing abrasive-blasting dust, hazardous chemicals, noise, plant and containment; verify adoption and status in the relevant jurisdiction.
- Model Code of Practice: Managing Risks of Hazardous Chemicals in the Workplace — guidance for SDS, chemical registers, exposure controls and health monitoring.
- Model Code of Practice: Managing Noise and Preventing Hearing Loss at Work — guidance for controlling hazardous noise and audiometric testing.
- Model Code of Practice: Managing Risks of Plant in the Workplace — guidance for guarding, inspection, isolation and maintenance.
- Model Code of Practice: Confined Spaces — apply where abrasive blasting is undertaken in, on or near a confined space.
- Model Code of Practice: How to Manage and Control Asbestos in the Workplace and How to Safely Remove Asbestos — apply where asbestos or asbestos-containing material is suspected.
- Safe Work Australia Workplace Exposure Standards for Airborne Contaminants — assess and control exposure to respirable crystalline silica, lead, metals and other airborne contaminants.
- AS/NZS 1715 Selection, use and maintenance of respiratory protective equipment; AS/NZS 1716 Respiratory protective devices.
- AS/NZS 1270 Acoustics—Hearing protectors; AS/NZS 1337.1 Personal eye protection; AS/NZS 1801 Occupational protective helmets; AS/NZS 2161 Occupational protective gloves; AS/NZS 2210.3 Safety footwear.
- AS 1210 Pressure vessels and AS 4343 Pressure equipment—hazard levels, together with manufacturer requirements, for inspection and safe operation of pressure equipment.
Standard SWMS Features (Click to Expand)
- Task-specific job steps, hazards and control measures
- Initial and residual risk ratings
- Assigned responsible persons for each job step
- Plant, equipment and PPE requirements where applicable
- Permits, qualifications and high-risk construction work details where applicable
- Worker consultation, sign-off and review sections
Suitable for Industries
Related templates
$79.50
$96.80
Includes all formats + 2 years updates
Acceptance guaranteed
If your client or principal requests changes during document review, BlueSafe will help revise the document at no extra cost and support resubmission until it is accepted.
$79.50
$96.80
One-time payment