Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS)

$96.80

The Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Abrasive Blasting of Diesel Mechanic Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Abrasive Blasting of Diesel Mechanic Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Abrasive Blasting of Diesel Mechanic Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inappropriate setup of equipment
    • Poor safety training
  • 2. Setting Up
    • Unauthorised access to the work area
    • Inappropriate use of Personal Protective Equipment (PPE)
  • 3. Work Area Inspection
    • Tripping hazards
    • Uncontained loose abrasives
  • 4. Equipment Inspection
    • Faulty or worn-out equipment
    • Lack of backup safety devices
  • 5. Abrasive Material Mixing
    • Dust exposure
    • Chemical exposure via abrasive materials
  • 6. Loading Abrasive Materials
    • Manual handling injuries
    • Inhalation of abrasives
  • 7. Blasting Operation
    • Noise exposure
    • Eye hazards from high-velocity particles
  • 8. Maintenance and Cleaning
    • Excessive dust
    • exposure to cleaning chemicals
  • 9. Vacuum Recovery
    • Inadequate ventilation
    • Exposure to airborne dust particles
  • 10. Decontamination
    • Exposure to heavy metals
    • Insufficient PPE
  • 11. Abrasive Refilling
    • Mishandling heavy bags
    • Exposure to harmful substances
  • 12. Equipment Shutdown
    • Incorrect shutdown process
    • Electrocution/ electrical hazards
  • 13. Completion of Blasting
    • Failure to inspect finished product
    • Improper storage of equipment
  • 14. Waste Disposal
    • Hazardous waste handling
    • Spills and leaks
  • 15. Site Clean up
    • Slips
    • trips
    • and falls
    • Contact with left over chemicals
  • 16. Documentation and Reporting
    • Inaccurate reporting of incidents
    • Non-compliance with regulations
  • 17. Equipment Storage
    • Improper storage
    • Fire hazards due to reactive substances
  • 18. Emergency Procedures
    • Lack of emergency training
    • Inadequate first aid provisions
  • 19. Regular Inspection & Servicing
    • Lack of maintenance leading to equipment failure
    • Ignoring minor faults
    • leading to major accidents
  • 20. Debriefing and handover
    • Lack of communication leading to unsafe practices
    • Not following correct handover protocol

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Abrasive Blasting of Diesel Mechanic Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart